• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to secondary sidebar

IRL Experience Design

  • Best Of
  • My Work
  • About
  • Austin Experiences
    • 60+ Weird Things To Do In Austin
    • The Top 13 Immersive Experiences in Austin, Texas
    • 45+ Unique Things To Do in Austin (A local’s guide)
    • Things to Do in Austin When it Rains
    • 5 Fun & Unique Austin Team Building Activities for Small Teams
    • Austin Halloween Guide
    • Austin Christmas Guide
    • Austin Easter Guide
  • Contact

#TheMuseumsProject

The Museum of This is a Jigsaw Puzzle

March 18, 2022

You walk into the museum and you are handled a photo of the museum. Or rather, what the museum looked like before it was disassembled. Things have been taken apart and moved around or placed in a big pile. You have 45 minutes to put it back together. 

The Pieces

There are 1000 pieces. Or maybe there are 500. Or 100. Some of the pieces are furniture, some of it is art, some of it is the floor. There might be pieces to other parts. Perhaps to models of patrons. They pieces vary in size. They’re not heavy though. Maybe the pieces light up when they are in the right place. Maybe there are snaps. Maybe there is no feedback on a correct placement.

Maybe there is a small puzzle on the table that is like the big puzzle and you also have to do that.

Competitive or Collaborative

It could be designed as a race or it could be framed in the same way jigsaw puzzles are: casually do this while hanging out with friends. Maybe there are levels. Perhaps you are only given enough pieces to do one wall at a time. Maybe there are two identical rooms and people are competing.

Variation: 2-dimensions

The pieces are are flat. when put together they make up a mural of the walls. The walls are perhaps magnetic and the pieces must be put together on the walls and on the furniture so that it looks like a museum again. 

ActorsMaybe there is an actor that comes in every now and then and adds more pieces or messes with stuff in a way that ups the challenge. Maybe when the pieces that the actor brought in are put together they reveal photos of the current puzzle-doers that were taken clandestinely as they have been trying to do the puzzle.

Posted Under: Experience Design Tags: #ExperienceIdeas, #Museums, #TheMuseumsProject

  • « Go to Previous Page
  • Page 1
  • Interim pages omitted …
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Page 9
  • Interim pages omitted …
  • Page 39
  • Go to Next Page »

Primary Sidebar

About Me

I make awesome experiences for people. Read More

Search my blog

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

See My Favorite Books

  • For IRL XD
  • For Learning
  • For Getting Things Done

@IRL_Experience_Design

instaglogo

Secondary Sidebar

See My Christmas Event Guide Featuring Holiday events for over 1000 cities!

A cute elf holds a map of Christmas and holiday events around the city.

See My 4th of July Event Guide Featuring Independence Day events for over 500 cities!

A cute uncle Sam holding up a paper showing different 4th of july images.

See My Halloween Event Guide Featuring Halloween events for over 1000 cities!

A cute ghost holding a map of Halloween Events

VISIT MY BOUTIQUE IMMERSIVE EXPERIENCE

SEE MY AUSTIN EVENTS WALL CALENDAR

Austin Events 2026 Wall Calendar Cover

Read My Recent Posts

  • Christmas Event Sites I’ve Built
  • More Websites for Fun
  • The Best 4th of July Events Website
  • Bulk Cold Emailing For Beginners
  • IRLXD Update 9/12/2024
  • Eureka Room Update 6/18/2024
  • A Creator’s Trap: Confusing the Joy of Creating with the User Experience

  • Contact
  • About
  • Privacy Policy