• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to secondary sidebar

IRL Experience Design

  • Best Of
  • My Work
  • About
  • Austin Experiences
    • 60+ Weird Things To Do In Austin
    • The Top 13 Immersive Experiences in Austin, Texas
    • 45+ Unique Things To Do in Austin (A local’s guide)
    • Things to Do in Austin When it Rains
    • 5 Fun & Unique Austin Team Building Activities for Small Teams
    • Austin Halloween Guide
    • Austin Christmas Guide
    • Austin Easter Guide
  • Contact

#TheMuseumsProject

The Museum of Hidden Art

August 22, 2020

Note: This post is part of my “Museums Project“, a collection of 200+ high-concept ideas for museums.

Perhaps this should be called “The Museum of Where is Everything?” Or “The Museum of What Did I Just Pay For?” Or “The Museum of Cracks and Holes”.

You pay your entry fee and go into the first gallery.

It’s empty.

Not only is it empty but the walls are replete with cracks and holes, the floor is a mishmash of tiles, and parts of the ceiling look like they’re about to fall on you.

There’s other visitors in the gallery. And they are examining the holes in the wall with glee.

At the MOH, the art is in the cracks, behind the walls and obstructed from view. 

You walk up to a crack that someone has just pulled away from. Eyeing you, they exclaim “That one is super cool”. 

You take their old position and look at the crack. Into the crack. There’s something in there, behind the wall. There’s a light and you can see about two feet in is a small painting the size of a book. It sits in a space that looks like a little two foot tall gallery. In fact, the effect is that you are looking into a full size gallery at a painting that is twelve feet tall. The gallery looks a lot like the one you are standing in, except its in far better condition.

You have the realization that when you are viewing the art, you are the only one in the room viewing it. You are the only one in the universe connecting with the art. You and this art are having an private moment right now.

The lights inside the tiny gallery flicker and go out. It’s time to see what else is in here.

You see another patron is picking something up from the floor. No, they’re not picking up anything. They are squatted down, looking into one of the many crooked and cracked tiles covering the floor. They stretch their neck upward, then look at the floor again. When they move on you take a look. 

Standing above it you can see the small tile is actually clear glass. You can see through it, down into the floor a few inches. There’s nothing to see. Then you see some scrolling LED letters spelling out a message to you. What does it say? It says “look up”. You look up. You look up and see a message through a hole in the ceiling. What does it say? “Look down”. How clever. You move on. Some of the art moves, some is audio, some is physical, some is just too hard to tell.

You explore the room more and discover other delights. 

Moving on to the next gallery you see there are penny-sized holes in the walls and there are book-sized holes in the walls. Some of the holes are low to the ground and some are so high you can’t reach them. A docent offers the use of a periscope.

Some of the holes are long slits and as you work your way down the slit you see a long painting or diorama. There are groups of holes, each focused on a different piece but when you see the different pieces you understand the story it’s telling.

One piece on a pedestal has many holes. You look in some of them and you see eyeballs. The eyeballs of the other people looking in the art are reflected around inside with mirrors. This is sort of awkward.

Other groups of holes require you to make the right choice. Through some of them you can’t view the art at quite the right angle. Or perhaps you see one perspective of a piece and through another hole you see a different perspective of the same piece.

The next gallery looks more like a typical gallery. There’s a painting on the wall and sculptures and objects to look at. And wow people are looking at them. Closely.

You realize it’s the same idea, but this time you look through art to see other art. You look through a painting of a horse being ridden by a general. The hole is in the horse’s eyes. Through the horse’s eyes you see wide open fields. You look through the general’s eyes. What do you see? You look through a flower vase, what do you see? Maybe some of this art is the same you saw in the first gallery. Maybe some of the art in this gallery only shows you pictures of cracked walls and erratically tiled flooring.

Will there be descriptions of the art? Can you look through those? Might those be behind the paintings you look through? Can we look through mona lisa’s smile or eyes?

Notes for design: The museum needs to be quiet. It is not a joke or a funhouse.

Posted Under: Experience Design Tags: #ExperienceIdeas, #Museums, #TheMuseumsProject

  • « Go to Previous Page
  • Page 1
  • Interim pages omitted …
  • Page 34
  • Page 35
  • Page 36
  • Page 37
  • Page 38
  • Page 39
  • Go to Next Page »

Primary Sidebar

About Me

I make awesome experiences for people. Read More

Search my blog

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

See My Favorite Books

  • For IRL XD
  • For Learning
  • For Getting Things Done

@IRL_Experience_Design

instaglogo

Secondary Sidebar

See My Christmas Event Guide Featuring Holiday events for over 1000 cities!

A cute elf holds a map of Christmas and holiday events around the city.

See My 4th of July Event Guide Featuring Independence Day events for over 500 cities!

A cute uncle Sam holding up a paper showing different 4th of july images.

See My Halloween Event Guide Featuring Halloween events for over 1000 cities!

A cute ghost holding a map of Halloween Events

VISIT MY BOUTIQUE IMMERSIVE EXPERIENCE

SEE MY AUSTIN EVENTS WALL CALENDAR

Austin Events 2026 Wall Calendar Cover

Read My Recent Posts

  • Christmas Event Sites I’ve Built
  • More Websites for Fun
  • The Best 4th of July Events Website
  • Bulk Cold Emailing For Beginners
  • IRLXD Update 9/12/2024
  • Eureka Room Update 6/18/2024
  • A Creator’s Trap: Confusing the Joy of Creating with the User Experience

  • Contact
  • About
  • Privacy Policy